DeveloperGutti Development
LocationWadi Al Safa 5, Dubai Land Residence Complex, Wadi Al Safa 5, Dubailand
StatusUnder construction
Property typeApartments

Overview

Veona by Gutti is the debut project by Gutti Development in Dubai Land Residence Complex, Dubai, in Wadi Al Safa 5. It is a low-rise building of a ground floor, a podium, five residential storeys and a rooftop fitted out as shared space. The homes are studios and one and two-bedroom apartments, with select homes offering private terraces and jacuzzis. The unit count is given two ways: 87 residences on the developer's own site, and 82 units on one portal, so the count is not settled. Sizes are given as 396 to 2,172 square feet on one portal and 698.43 to 2,019.75 square feet on another, so the sizes are not settled either.

Key takeaways: Veona

  • Debut project by Gutti Development; founded 2024
  • 87 residences (official) vs 82 units (portal) - conflict; G+P+5+R
  • Studios-2BR; private terraces + jacuzzis in select homes
  • Handover Q4 2027 (31 Dec 2027) vs Q2 2027 - conflict; plan 40/60 vs 10/60
  • Construction started 2 Nov 2025; 2.14% complete; sales from 1 Nov 2025

Veona by Gutti is the debut project by Gutti Development in Dubai Land Residence Complex, Dubai, in Wadi Al Safa 5. It is a low-rise building of a ground floor, a podium, five residential storeys and a rooftop fitted out as shared space. The homes are studios and one and two-bedroom apartments, with select homes offering private terraces and jacuzzis. The unit count is given two ways: 87 residences on the developer's own site, and 82 units on one portal, so the count is not settled. Sizes are given as 396 to 2,172 square feet on one portal and 698.43 to 2,019.75 square feet on another, so the sizes are not settled either.

The building is designed around proportion, light and quiet rather than scale. The amenities are defined upfront and aligned with daily living: indoor and outdoor gyms, a swimming pool, children's areas, a clubhouse and a rooftop outdoor cinema, with a day care centre.

Dubai Land Residence Complex is a large residential district in Dubailand, with apartments, shops and services at a lower entry point than the established tower districts. It suits a buyer who wants a new-build apartment in a growing residential community, close to the road links of Dubailand, and who prefers a low-rise building to a tower.

Gutti Development was founded in Dubai in 2024 and is registered with the Dubai Land Department as Gutti Real Estate Development L.L.C., with developer number 2174 from December 2024. The company presents itself as a design-focused brand, and Veona is its first project. Construction started on 2 November 2025, and the project was 2.14 percent complete at the last update. Sales started on 1 November 2025.

Handover for Veona is set for the fourth quarter of 2027, on 31 December 2027. One portal gives the second quarter of 2027 instead, so the date is not fully settled. The payment plan is 40/60 on one portal, with 20 percent on booking, 20 percent during construction and 60 percent on handover. Another portal gives a 10/60 plan, and a third lists a 10 percent down payment, so the plan is not fully settled either.

Veona by Gutti suits a buyer looking for a small, design-led apartment in Dubai Land Residence Complex, with a rooftop outdoor cinema and a day care centre in the building. It is not a project for a buyer who needs a settled unit count, settled sizes or a settled payment plan, since all three are reported in more than one version.

Payment plan: 40/60: 20% on booking, 20% during construction, 60% on handover (Palmera); 10/60 and a 10% down payment also reported

Before you buy at Veona

  • Check the project's RERA registration and its escrow account with the Dubai Land Department before paying a deposit.
  • Get the payment schedule and the expected handover date in writing; both can change during construction.
  • Ask for the yearly service charge per square foot; it is set by the building's owners association and approved by RERA.
  • Budget for the 4% Dubai Land Department transfer fee on top of the price.

Our buyer guides explain what buying off-plan means, how payment plans work, Dubai Land Department fees, buying as a foreigner and the Golden Visa for property owners.

Veona in Wadi Al Safa 5, Dubailand: compare similar homes

Veona is in Wadi Al Safa 5, Dubailand, built by Gutti Development.

Buyer guides

Veona: FAQs

Where is Veona?

In Dubai Land Residence Complex, in Wadi Al Safa 5, Dubailand.

What homes does it offer?

Studios and one and two-bedroom apartments, with select homes offering private terraces and jacuzzis. The unit count is given as 87 and as 82.

When will Veona hand over?

In the fourth quarter of 2027, on 31 December 2027. One portal gives the second quarter of 2027 instead.

What is the payment plan?

Three versions are reported: 40/60, 10/60 and a 10 percent down payment. The plan is not settled.

What amenities does it offer?

Indoor and outdoor gyms, a swimming pool, children’s areas, a clubhouse, a rooftop outdoor cinema and a day care centre.

Who is the developer?

Gutti Development, founded in Dubai in 2024.

More by Gutti Development
Enquire now Official page