Under construction Apartments Verified Nov 2026

Maravea Residences

Dubai Islands by Enzo Prime Development

DeveloperEnzo Prime Development
LocationDubai Islands
StatusUnder construction
Property typeApartments

Overview

Maravea Residences is an off-plan waterfront project by Enzo Developers on Dubai Islands, in Palm Deira. It is the developer's debut in Dubai, and it is built around a simple idea: a small building with few homes, where the shared spaces matter as much as the apartments. The name draws from Mara, meaning sea, and Vea, meaning vision. The building has 63 residences across eight residential floors, above a ground floor, two podium levels and a rooftop.

Key takeaways: Maravea Residences

  • Debut project by Enzo Developers, Dubai Islands
  • 63 residences, G+2P+8+R; 1-3BR + the Maison
  • Handover Q4 2028; DLD project 4189, started Nov 2025, 0% complete
  • Plan 50/50 vs 40/20/40 post-handover - conflict
  • Three amenity layers: podium, 8th floor, rooftop

Maravea Residences is an off-plan waterfront project by Enzo Developers on Dubai Islands, in Palm Deira. It is the developer's debut in Dubai, and it is built around a simple idea: a small building with few homes, where the shared spaces matter as much as the apartments. The name draws from Mara, meaning sea, and Vea, meaning vision. The building has 63 residences across eight residential floors, above a ground floor, two podium levels and a rooftop.

The homes are one, two and three-bedroom apartments, plus a single three-bedroom Maison designed around privacy and a more exclusive way of living, with expansive interiors, outdoor space and marble flooring throughout. For just 63 homes, the developer has split the communal spaces across three layers: the podium base, the eighth floor and the rooftop, with three dedicated floors of lifestyle and fitness amenities. The project is described as a complete island living address, with enduring value, boutique rarity and a coastal lifestyle.

Dubai Islands is Nakheel's five-island waterfront masterplan off the coast of Deira, with more than 20 kilometres of beaches, marinas, resorts and retail promenades, and it is part of Dubai Vision 2040. Maravea sits two minutes on and off the islands, close to Dubai International Airport and the mainland. The area is still building out, so buyers are buying into a destination that is taking shape rather than a finished community.

Construction started in November 2025, and the Dubai Land Department register shows the project, number 4189, at zero percent complete, with an expected completion in the second quarter of 2028. Handover is set for the fourth quarter of 2028, with 31 December 2028 given as the target date. The payment plan is given two ways: 50 percent during construction and 50 percent on handover, split as 20 percent on booking, 30 percent during construction and 50 percent on handover, or a 40/20/40 post-handover plan on the developer's own site. The two versions do not agree, so the plan is not settled.

Maravea Residences suits a buyer looking for a small, boutique waterfront home on Dubai Islands, with few neighbours and a strong amenity offer for the size of the building. It is not a project for a buyer who needs a finished community or a developer with completed homes on record.

Payment plan: 50/50: 20% on booking, 30% during construction, 50% on handover (Metropolitan); 40/20/40 post-handover also reported (official site)

Before you buy at Maravea Residences

  • Check the project's RERA registration and its escrow account with the Dubai Land Department before paying a deposit.
  • Get the payment schedule and the expected handover date in writing; both can change during construction.
  • Ask for the yearly service charge per square foot; it is set by the building's owners association and approved by RERA.
  • Budget for the 4% Dubai Land Department transfer fee on top of the price.

Our buyer guides explain what buying off-plan means, how payment plans work, Dubai Land Department fees, buying as a foreigner and the Golden Visa for property owners.

Maravea Residences in Dubai Islands: compare similar homes

Maravea Residences is in Dubai Islands, built by Enzo Prime Development. Looking for apartments in Dubai Islands? Compare every project side by side in our guide to apartments in Dubai Islands.

Buyer guides

Maravea Residences: FAQs

Where is Maravea Residences?

On Dubai Islands, in Palm Deira, two minutes on and off the islands.

How many homes are there?

63 residences across eight residential floors, plus a ground floor, two podium levels and a rooftop.

What homes does it offer?

One, two and three-bedroom apartments, plus a single three-bedroom Maison.

When will Maravea Residences hand over?

The fourth quarter of 2028, with 31 December 2028 given as the target date.

What is the payment plan?

50 percent during construction and 50 percent on handover is reported, and the developer site also shows a 40/20/40 post-handover plan. The plan is not settled.

Who is the developer?

Enzo Developers, a boutique Dubai developer backed by MPU Group, founded in 1932.

More by Enzo Prime Development
Enquire now Official page