Artistry One Residences
Overview
Key takeaways: Artistry One Residences
- Artistry One is a 36-storey tower in Dubai Design District by Select Group.
- Homes are 1 to 3-bedroom residences and 4-bedroom duplex penthouses.
- Handover in 2029; payment plan is 50/50 linked to construction.
Artistry One Residences is a residential tower in Dubai Design District, known as d3, by Select Group. It was launched in January 2026. The tower rises 36 storeys above Dubai Canal, and Select Group describes it as design-led living, where design is something you live in, not just look at.
Dubai Design District is a creative district on the Dubai Canal, with studios, galleries, shops and offices. Artistry One is one of the first residential towers in the district, and it sits on the canal front, with views across the water to the Burj Khalifa and the Downtown skyline.
The homes are one, two and three-bedroom residences, and four-bedroom duplex penthouses. Floor-to-ceiling glass frames the Burj Khalifa, the Downtown skyline and Dubai Canal from each home. Warm natural materials and open layouts run through the tower.
The duplex penthouses range from 4,638 to 7,765 sq ft. Each has private terraces, a plunge pool and dual access points. Two signature residences add rooftop terraces with plunge pools. Sizes for the one, two and three-bedroom residences were not published on the Select Group page, so they are not stated here.
Amenities cover wellness, leisure and work, all in the building. On Level 21 there is an infinity lap pool with sun decks. The gym is fully equipped, with a training studio for yoga and Pilates, padel courts, a sauna, a steam room and ice baths. There are residents' lounges, co-working spaces and family leisure zones. Penthouse owners have private terraces with plunge pools.
Artistry One sits minutes from Downtown Dubai, the Burj Khalifa, Dubai Mall, Business Bay and DIFC, according to Select Group. Al Khail Road, Ras Al Khor Road and Al Ain Road connect the district to the rest of the city. The Dubai Canal runs beside the tower, and the district's shops, cafes and galleries are on foot.
The development is scheduled to be handed over in 2029. The payment plan is 50/50, linked to construction progress: 20% down payment, 10% at 20% completion, 10% at 30% completion, 10% at 40% completion, and 50% on handover in 2029.
Artistry One suits buyers who want a design-led home in a creative district, with canal and Burj Khalifa views, and who work from home at least some of the time, given the co-working spaces in the building. It suits buyers who drive or use the roads around d3, as the district has no metro station of its own. It is not the right choice for buyers who want a studio, a villa, or a home in a long-settled community.
Payment plan: 50/50, linked to construction: 20% down payment, 10% at 20% completion, 10% at 30% completion, 10% at 40% completion, 50% on handover (2029)
Before you buy at Artistry One Residences
- Check the project's RERA registration and its escrow account with the Dubai Land Department before paying a deposit.
- Get the payment schedule and the expected handover date in writing; both can change during construction.
- Ask for the yearly service charge per square foot; it is set by the building's owners association and approved by RERA.
- Budget for the 4% Dubai Land Department transfer fee on top of the price.
Our buyer guides explain what buying off-plan means, how payment plans work, Dubai Land Department fees, buying as a foreigner and the Golden Visa for property owners.
Artistry One Residences in Dubai Design District: compare similar homes
Artistry One Residences is in Dubai Design District, built by Select Group.
Buyer guides
Artistry One Residences: FAQs
Who is developing Artistry One Residences?
Select Group, in Dubai Design District.
How tall is Artistry One?
36 storeys above Dubai Canal.
What homes are in the tower?
One, two and three-bedroom residences, and four-bedroom duplex penthouses.
How large are the penthouses?
From 4,638 to 7,765 sq ft, each with a private terrace and plunge pool.
When is handover?
In 2029, according to Select Group.
What is the payment plan?
50/50, linked to construction: 20% down, then 10% at 20%, 10% at 30% and 10% at 40% completion, with 50% on handover.