Snagging and Handover Checklist for New Homes in Dubai
Snagging is the inspection of a new home before you accept the keys, to list defects for the developer to fix. In Dubai, check finishes, plumbing, electrics, air conditioning, doors and windows, record every fault in writing before signing the handover, and use the defects liability period that follows completion.
- 10 years
- Structural warranty
- 1 year
- Installations warranty
- Completion certificate
- Warranties start from
- ~AED 1,000–3,000
- Professional inspection (apartment)
- 40–80
- Typical items on a new-build list
- Month 10–11
- Second inspection

The quick answer
Snagging means inspecting a new home for defects, called snags, before or at handover and getting the developer to fix them. In Dubai you should do it before you sign the handover acceptance, ideally with a professional inspector, and send the developer a written, photographed list. The developer must fix defects under its warranties: Dubai Law No. 6 of 2019 makes developers responsible for structural defects for 10 years and for fixtures such as electrical, plumbing and air-conditioning installations for one year from completion. A careful inspection costs a small fraction of the price and is far easier than chasing repairs after you have moved in or let the home.
How handover works in Dubai
- Completion notice. The developer obtains the building completion certificate and sends a handover notice with the final amount due: the last instalment, any service charges from handover and utility deposits or admin fees.
- Final payment and clearances. You pay the balance (or your bank does) and receive clearance letters.
- Inspection appointment. The developer books a visit for you to inspect the unit. This is your snagging window.
- Snag list submitted. You send a written list of defects with photos. The developer agrees a timescale to fix them.
- De-snagging. You or your inspector re-check that each item has been properly fixed.
- Keys and title deed. You sign the handover acceptance, collect the keys, register with DEWA for electricity and water, and the developer applies for your title deed to replace the Oqood registration.
If you bought off-plan, the earlier stages are explained in our guide to escrow and Oqood.
Developer warranties: what the law says
| What | Developer responsible for | From |
|---|---|---|
| Structural defects (foundations, frame, load-bearing walls) | 10 years | Completion certificate |
| Fixtures and installations (electrical, plumbing, mechanical, air-conditioning) | 1 year | Completion certificate |
| Snags found at handover | Fix within the agreed period | Handover inspection |
| Appliances supplied with the unit | Manufacturer warranty, usually 1–2 years | Handover |
The one-year period for installations runs from completion, not from the day you move in, so if you collect keys months after the building was completed, part of that warranty may already have passed. That is another reason to inspect early.
What you pay at handover
Handover is also when several costs fall due at once. Plan your cash before the completion notice arrives.
| Cost | Typical amount | Notes |
|---|---|---|
| Final instalment | Often 20–60% of the price | Set by your payment plan; can be financed with a mortgage |
| Service charges | Usually the first quarter or year in advance | Some developers waive the first year |
| Title deed issue | A few hundred dirhams | Paid to the DLD, often through the developer |
| DEWA connection deposit | About AED 2,000 for an apartment, more for villas | Refundable when you close the account |
| District cooling (if any) | Connection or activation fee | Charged by the cooling provider, not DEWA |
| Snagging inspection | From about AED 1,000 | Optional but strongly recommended |
If you are taking a mortgage for the final payment, the bank's valuation and approval must be complete before the handover deadline, so start the application as soon as the developer confirms a completion date. See mortgages in Dubai for expats.
What you pay at handover
Handover is also when several costs fall due at once. Plan your cash before the completion notice arrives.
| Cost | Typical amount | Notes |
|---|---|---|
| Final instalment | Often 20–60% of the price | Set by your payment plan; can be financed with a mortgage |
| Service charges | Usually the first quarter or year in advance | Some developers waive the first year |
| Title deed issue | A few hundred dirhams | Paid to the DLD, often through the developer |
| DEWA connection deposit | About AED 2,000 for an apartment, more for villas | Refundable when you close the account |
| District cooling (if any) | Connection or activation fee | Charged by the cooling provider, not DEWA |
| Snagging inspection | From about AED 1,000 | Optional but strongly recommended |
If you are taking a mortgage for the final payment, the bank's valuation and approval must be complete before the handover deadline, so start the application as soon as the developer confirms a completion date. See mortgages in Dubai for expats.
Should you hire a professional snagging company?
You can inspect yourself with the checklist below, but professional inspectors find more. They use moisture meters, thermal cameras, socket testers and levels, and they know where Dubai builds commonly go wrong. Fees are typically from about AED 1,000–3,000 for an apartment, depending on size, and more for villas. Their report gives you a clear, photographed document to send to the developer, which carries more weight than a handwritten list.
The snagging checklist, room by room
Walls, ceilings and floors
- Cracks, uneven plaster, paint drips, patchy colour, stains that may show leaks
- Tiles: chips, uneven joints, lippage and hollow-sounding tiles (tap them)
- Wooden floors: gaps, squeaks, raised boards near wet areas
- Skirting boards firmly fixed and sealed
Doors and windows
- Doors open, close and lock smoothly; no gaps or scraping
- Windows and balcony doors seal properly; check rubber seals and locks
- Glass free of scratches and cracks; no condensation between double-glazed panes
Bathrooms and wet areas
- Run every tap and shower for several minutes: pressure, hot water, no leaks under basins
- Floors slope to the drain, with no standing water
- Silicone sealant complete around baths, showers and basins
- Toilets flush and refill correctly; extractor fans work
Kitchen
- Cabinet doors and drawers aligned, soft-close working, no damaged surfaces
- Worktop joints sealed; sink and tap fixed firmly with no leaks
- Every supplied appliance turns on and works; ask for warranty cards
Electrical
- Every socket and switch works; test with a plug-in tester
- All lights work; distribution board labelled and breakers not tripping
- Smoke detectors and any intercom or smart-home system working
Air-conditioning
- Every room cools to the set temperature within a reasonable time
- No unusual noise, rattling or water dripping from units or vents
- Thermostats work; for district cooling, ask for the provider's account details
Balconies, terraces and outside areas
- Railings secure and at a safe height; glass panels intact
- Drains clear and floors slope away from the door
- Villas: roof, external walls, garden irrigation, garage door and boundary walls
Common areas and documents
- Parking bay matches your contract; storage unit if included
- Access cards and keys for every door, mailbox and amenity
- Copy of the completion certificate, warranties and unit area confirmation
Extra checks for villas and townhouses
- Roof and terrace waterproofing: look for stains on top-floor ceilings and check roof drains
- External render and paint: cracks near windows and corners
- Garden levels slope away from the house; irrigation and outside taps work
- Garage door, gate motor and outdoor lighting work
- Water tank, pump and water heater installed, labelled and not leaking
- Maid's room, laundry and storage areas get the same inspection as the main rooms
Extra checks for villas and townhouses
- Roof and terrace waterproofing: look for stains on top-floor ceilings and check roof drains
- External render and paint: cracks near windows and corners
- Garden levels slope away from the house; irrigation and outside taps work
- Garage door, gate motor and outdoor lighting work
- Water tank, pump and water heater installed, labelled and not leaking
- Maid's room, laundry and storage areas get the same inspection as the main rooms
Worked example: a typical snag report
For a newly completed two-bedroom apartment of about 1,200 sq ft, a professional inspection might record:
| Area | Items found | Severity |
|---|---|---|
| Living room | Paint marks on ceiling, one hollow floor tile, sliding door lock stiff | Minor |
| Master bathroom | Shower floor holds water, incomplete silicone around basin | Moderate |
| Kitchen | Two cabinet doors misaligned, scratch on oven door | Minor |
| Bedroom 2 | AC unit dripping water, socket not working | Moderate |
| Balcony | Drain partly blocked with construction debris | Moderate |
Forty to eighty items is not unusual for a new home, and most are minor. What matters is that each is recorded with a photo and location, and checked again after the developer's repairs.
Accept the keys, or wait?
For minor and moderate snags, most buyers accept handover with the snag list formally recorded, so they can start using or letting the home while repairs are done. For serious problems, such as water leaks, unsafe electrics or air-conditioning that does not cool, insist that they are fixed before you sign, or that the handover document records them clearly with a date for repair. Never sign a statement that the unit is accepted "in good condition" without your list attached.
After handover: using the warranty
- Report new defects to the developer's customer care in writing, with photos and dates.
- Keep a log of every request and reply.
- Book a second inspection about 10–11 months after completion, before the one-year installation warranty ends.
- Escalate unresolved issues through the developer's complaints process, then to RERA or legal advice if needed.
Common mistakes to avoid
- Signing the handover acceptance before inspecting.
- Inspecting at night or without power and water connected.
- Sending the snag list by phone or WhatsApp only, without a written, dated record.
- Not checking that repairs were actually done before signing off.
- Letting the one-year installation warranty expire without a second inspection.
Planning to rent the home out once it is ready? Read our landlord's guide to renting out property in Dubai, and see current off-plan projects nearing handover.
Projects mentioned in this guide
Live project pages from our directory, with unit sizes, status and sources.
Binghatti Circle
Jumeirah Village Circle (JVC)
- Studio to 3-bedroom apartments
- Apartments
- Completion Q2 2027
Ellington House
Dubai Hills Estate
- Apartments and penthouses
- Apartments, Penthouses
Frequently asked questions
What is snagging?
Snagging is inspecting a new property for defects, from paint marks and loose tiles to leaks and faulty air-conditioning, and asking the developer to fix them before or soon after handover.
How long is a developer's warranty in Dubai?
Under Dubai Law No. 6 of 2019, developers are responsible for structural defects for 10 years and for fixtures and installations such as electrics, plumbing and air-conditioning for one year from the completion certificate.
How much does a snagging inspection cost in Dubai?
Professional inspections typically start from about AED 1,000–3,000 for an apartment, depending on size and the company, and cost more for villas.
Should I sign the handover before snagging?
No. Inspect first, and attach your snag list to the handover document so the developer's obligation to fix each item is on record.
How long does a developer take to fix snags?
It varies by developer and the number of items. Agree a timescale in writing at handover, usually a few weeks, and re-inspect once repairs are complete.
Can I snag a resale property?
Yes. Developer warranties may have expired, but an inspection before signing Form F helps you negotiate the price or ask the seller to fix defects.
What are the most common snags in Dubai new builds?
Paint and plaster finish, hollow tiles, poor silicone in bathrooms, slow drainage, air-conditioning leaks, misaligned doors and cabinets, and electrical points that do not work.
What should I do if a defect appears after I move in?
Report it to the developer's customer care in writing with photos. If it is within the warranty period, the developer should fix it at no cost.